CHP Plant Capstone C1000 + APROVISCapstone
C1000
CHP Plant Capstone C1000 + APROVIS
Capstone
C1000
Leto izdelave
2015
Stanje
Rabljeno
Lokacija
Laško 

Osnovni podatki
- Oznaka stroja:
- CHP Plant Capstone C1000 + APROVIS
- Proizvajalec:
- Capstone
- Model:
- C1000
- Leto izdelave:
- 2015
- Stanje:
- rabljeno
- Obratovalne ure:
- 50.000 h
Cena in lokacija
- Lokacija:
- Laško, Slovenija

Pokliči
Tehnične podrobnosti
Motor in menjalnik
Gorivo:
gospodinjski plin H
Podrobnosti o moči
Vhodna napetost:
400 V
Vhodna frekvenca:
50 Hz
Vhodni tok:
1.444 A
Vrsta vhodnega toka:
trifazni
Dokumentacija in certifikacija
Dokumentacija / priročnik
Hlajenje
Vrsta hlajenja:
zrak
Dodatne podrobnosti
Nazivna (navidezna) moč:
999 kVA
Največja hitrost vrtenja:
60.000 obr/min
Podrobnosti ponudbe
- ID oglasa:
- A22903560
- Referenčna številka:
- SPTE-C1000
- Posodobitev:
- nazadnje dne 08.10.2026
Opis
Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, rated at 200 kW each; electrical output of the complete package 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economiser stages for heat recovery.
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
Bodsz I T Ekepfx Apasdi
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms by agreement.
Main equipment:
• Capstone C1000: five C200 microturbine modules, rated at 200 kW each; electrical output of the complete package 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economiser stages for heat recovery.
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
Bodsz I T Ekepfx Apasdi
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms by agreement.
Ponudnik
Opomba: Brezplačno se registrirajte ali prijavite, za dostop do vseh informacij.
Registriran od: 2025
2 Oglasi na spletu
Pošlji povpraševanje
Telefon & Faks
+386 51 2... oglasi
Ti oglasi bi vas prav tako lahko zanimali.
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Hamburg
890 km
110 kVA zasilni generator
Newpower GeneratorNWR125 Ricardo Motor Newpower Generator
Newpower GeneratorNWR125 Ricardo Motor Newpower Generator
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Genthin
726 km
Blokovna kogeneracijska naprava
JenbacherJMS 312
JenbacherJMS 312
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Nemčija
650 km
Elektrarna za soproizvodnjo toplote in električne energije
MAN/Daimler Benz/Krauter12 Zylinder/8 Zylinder
MAN/Daimler Benz/Krauter12 Zylinder/8 Zylinder
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
La Muela
1.382 km
Soproizvodni obrat
Jenbacher616
Jenbacher616
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Nemčija
614 km
Generator
Liebherr - AltronicG 924 TI
Liebherr - AltronicG 924 TI
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Pontecagnano Faiano
614 km
Trigeneracijska naprava 1.262 kW
Centrica Business SolutionsMTU 12V4000 L33
Centrica Business SolutionsMTU 12V4000 L33
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Erding
335 km
Blokovna kogeneracijska naprava
WolfGTK 200E01
WolfGTK 200E01
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Kairiai
1.235 km
Kogeneracijska elektrarna
MWM GmbHTCG 2016 V8C
MWM GmbHTCG 2016 V8C
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Gaildorf
505 km
Blokovna kogeneracijska naprava
WOLF Power Systems140 GTK
WOLF Power Systems140 GTK
Uspešno
Vaše sporočilo je bilo poslano.
Mali oglas
Sinsheim
572 km
Soproizvodna elektrarna na biomaso (BHKW)
SEnergie GmbHG6.12TI
SEnergie GmbHG6.12TI
Vaš oglas je bil uspešno izbrisan
Prišlo je do napake





































































































