9000L 316L GMP pralni/eluacijski rezervoarBRINOX 9.000 L Waschlösungsbehälter
BH6752-BH1001 Paket 32
9000L 316L GMP pralni/eluacijski rezervoar
BRINOX 9.000 L Waschlösungsbehälter
BH6752-BH1001 Paket 32
Leto izdelave
2020
Stanje
Novo
Lokacija
Solingen 

Prikaži slike
Prikaži karto
Podatki o stroju
- Opis stroja:
- 9000L 316L GMP pralni/eluacijski rezervoar
- Proizvajalec:
- BRINOX 9.000 L Waschlösungsbehälter
- Model:
- BH6752-BH1001 Paket 32
- Leto izdelave:
- 2020
- Stanje:
- novo
- Funkcionalnost:
- popolnoma funkcionalen
Cena in lokacija
- Lokacija:
- Landwehrstraße 55-65, 42699 Solingen, Deutschland

Klic
Tehnične podrobnosti
- Kapaciteta rezervoarja:
- 9.000 l
- Oprema:
- dokumentacija / priročnik
Podrobnosti ponudbe
- ID ponudbe:
- A21242137
- Št. reference:
- BH6752-BH1001 Paket 32
- Nazadnje posodobljeno:
- dne 22.02.2026
Opis
BRINOX 9000 L GMP Washing and Elution Solution Tank
Horizontal Stainless Steel Pressure Vessel – Year of Manufacture 2020 – Complete FAT & GMP Documentation
BH6752-BH1001 Package 32
Manufacturer: BRINOX Process Systems
Serial Number: 1003558
Year of Manufacture: 2020
Nominal Volume: 9,000 liters
Design: GMP-compliant stainless steel pressure vessel
Application
The tank was used in a pharmaceutical production facility.
Suitable for the production, storage, and supply of process solutions in GMP-regulated environments.
Construction and Equipment
Cylindrical stainless steel tank in horizontal design
End-face process connections
Large manway with pressure closure
Integrated CIP system with spray ball
High-gloss polished internal surface
Hygienic, product-contacting connections
Multiple measuring and instrumentation nozzles
Documented weld seams with full traceability
Separate stainless steel feet included in delivery
Condition
Very good optical and technical condition.
Internal surfaces are mirror-polished and clean.
No visible damage to the shell or connections.
Accessories and auxiliary components are present as per photo documentation.
FAT and Documentation Status
According to FAT documentation “IT-11.1 Welding Documentation Inspection”, the welding documentation was inspected as part of factory acceptance testing (FAT 01, 23.10.2020).
The following were confirmed, among others:
Identification of welders and weld seam inspectors
Welder qualifications per EN ISO 9606-1
WPS and WPQR documentation
Proof of shielding gas suitability
Documented test welds
Spot sample visual inspection without defects
Traceability according to material certificates 3.1
The complete welding documentation is included in the Turn-Over-Package.
Documentation – Fully Available
FAT plan and FAT report
Layout and construction drawings
P&ID diagrams
Calibration protocols
Surface and roughness tests
Leak test
Welding plan
WPQR
WPS
Welder qualifications
Borescopy report
Bsdpfx Asykkk Hjg Tecw
Incoming goods inspection reports
Sensor calibrations
The complete technical documentation is available in digital format.
Special Features
Fully documented GMP version with certified welding documentation and comprehensive quality package.
Very well suited for reinstallation in pharmaceutical production plants or validation-required applications.
Oglas je bil preveden samodejno, zaradi česar je morda prišlo do napak pri prevodu.
Horizontal Stainless Steel Pressure Vessel – Year of Manufacture 2020 – Complete FAT & GMP Documentation
BH6752-BH1001 Package 32
Manufacturer: BRINOX Process Systems
Serial Number: 1003558
Year of Manufacture: 2020
Nominal Volume: 9,000 liters
Design: GMP-compliant stainless steel pressure vessel
Application
The tank was used in a pharmaceutical production facility.
Suitable for the production, storage, and supply of process solutions in GMP-regulated environments.
Construction and Equipment
Cylindrical stainless steel tank in horizontal design
End-face process connections
Large manway with pressure closure
Integrated CIP system with spray ball
High-gloss polished internal surface
Hygienic, product-contacting connections
Multiple measuring and instrumentation nozzles
Documented weld seams with full traceability
Separate stainless steel feet included in delivery
Condition
Very good optical and technical condition.
Internal surfaces are mirror-polished and clean.
No visible damage to the shell or connections.
Accessories and auxiliary components are present as per photo documentation.
FAT and Documentation Status
According to FAT documentation “IT-11.1 Welding Documentation Inspection”, the welding documentation was inspected as part of factory acceptance testing (FAT 01, 23.10.2020).
The following were confirmed, among others:
Identification of welders and weld seam inspectors
Welder qualifications per EN ISO 9606-1
WPS and WPQR documentation
Proof of shielding gas suitability
Documented test welds
Spot sample visual inspection without defects
Traceability according to material certificates 3.1
The complete welding documentation is included in the Turn-Over-Package.
Documentation – Fully Available
FAT plan and FAT report
Layout and construction drawings
P&ID diagrams
Calibration protocols
Surface and roughness tests
Leak test
Welding plan
WPQR
WPS
Welder qualifications
Borescopy report
Bsdpfx Asykkk Hjg Tecw
Incoming goods inspection reports
Sensor calibrations
The complete technical documentation is available in digital format.
Special Features
Fully documented GMP version with certified welding documentation and comprehensive quality package.
Very well suited for reinstallation in pharmaceutical production plants or validation-required applications.
Oglas je bil preveden samodejno, zaradi česar je morda prišlo do napak pri prevodu.
Ponudnik
Opomba: Brezplačno se registrirajte ali prijavite, za dostop do vseh informacij.
Pošlji zahtevo
Telefon & Faks
+49 212 2... oglasi
Vaš oglas je bil uspešno izbrisan
Prišlo je do napake




































